The gas supply to 44 buildings will be shut off starting on Monday, May 17 to allow for the installation of new utility connections. The duration of the gas shutoffs will range from four to 12 days. During the shutoffs, hot water and heating to the buildings will not be available. Faculty and staff can occupy offices and workspaces in buildings while the gas is turned off. For the list of shutoff dates and affected buildings, see the PolyCentric story.