Facilities Management is continuing with the annual maintenance of several of the asphalt parking lots on campus. The work consists of repairing the existing cracks, resealing the asphalt concrete and restriping the parking spaces. To date, Lot E-2 and Lots J-1 through J-4 are complete. The remaining work is scheduled as follows: Lot C will remain closed until Friday, Sept. 12; Lot D will be closed Sept. 12-15; and Lots G & N will be closed Sept. 14-16. In addition, Oak and Magnolia lanes, from University Drive to the CLA Building, will be closed Sept. 15-19. For more information, call (909) 869-3030.